Logo

We have different ways of installing your new system.

Installation During Dry-dock

When your vessel visits dry-dock for planned maintenance, it is a golden opportunity to do installations, as the restrictions are few and it is possible to work continuously. Usually we will perform this type of installation with a Supervisor from our team and then make use of the opportunity to source further Technicians on site.

Insatech Marine Dry Dock Installation 16 9

Installation as Sail-along

Installing larger systems or instrumentation that requires larger modifications can often be done during sail-along. We will board the vessel in one port with our crew, who will have an action-plan ready beforehand. This plan will be developed and adapted in coordination with the vessel’s crew up front, allowing to work on piping during the normal operation – with no interruptions of the daily itinerary.

Insatech Marine Sail Along Installation 16 9

Hub-installation at a Strategic Location

In the case of multiple installations of systems on a fleet (or part of it), we can set up a hub in a strategic and logistically central location, from where our crew will board the vessels as they arrive, and then perform installations during cargo operations. In this setup, we will typically bring a crew that is specifically chosen for the specific installation along with a skilled Supervisor of our own.

Insatech Marine Hub Installation 16 9
To top

Search